← Glossar

Pack gate

The intake check that accepts a goods specification pack and refuses service proposals and works or install packs. Same compiler; wrong file type does not enter write-back.

The pack gate is the first step of Orbid. The desk brings the spreadsheet the buyer sent. If the pack is a goods specification workbook — locked cells, required rows, catalog-shaped columns — it proceeds to catalog match and write-back. If the pack is a service proposal, a construction scope, or an install bundle, Orbid refuses it. The product does not write prose bids.

Why a gate exists

A goods cell is a SKU commitment. A service line is a different job. Mixing them on one compiler would invent answers the factory cannot ship. The gate keeps the original-file promise honest.

What happens after the gate

Accepted packs go to catalog match. Each required row is bound to a product you sell, or marked as a gap. Proven cells write back. Unproven cells stay blank. Healthcare equipment packs (GPO, hospital, VA) use the same gate; they are an industry slot, not a different product.

Verwandte Begriffe

Write-backGoods specCatalog match

Hersteller-Bid-Desk

MedTech-Ausschreibungsautomatisierung (Definition)Beste Tender-Management-Software 2026Tender-Management-Software-Vergleich
Demo buchen

Bringen Sie ihre
Tabelle mit.

Demo buchen. Wir laufen die Datei, die der Käufer schickte — welche Zellen wir schreiben, welche leer bleiben, und warum.

Pack gate beim Rückschreiben der Originaltabelle