← 術語表

Pack gate

The intake check that accepts a goods specification pack and refuses service proposals and works or install packs. Same compiler; wrong file type does not enter write-back.

The pack gate is the first step of Orbid. The desk brings the spreadsheet the buyer sent. If the pack is a goods specification workbook — locked cells, required rows, catalog-shaped columns — it proceeds to catalog match and write-back. If the pack is a service proposal, a construction scope, or an install bundle, Orbid refuses it. The product does not write prose bids.

Why a gate exists

A goods cell is a SKU commitment. A service line is a different job. Mixing them on one compiler would invent answers the factory cannot ship. The gate keeps the original-file promise honest.

What happens after the gate

Accepted packs go to catalog match. Each required row is bound to a product you sell, or marked as a gap. Proven cells write back. Unproven cells stay blank. Healthcare equipment packs (GPO, hospital, VA) use the same gate; they are an industry slot, not a different product.

相關術語

Write-backGoods specCatalog match

廠商投標台

MedTech 應標自動化(定義)2026 最佳投標管理軟件投標管理軟件對比
預約示範

帶上買方的
規格表。

預約示範。我們用您發來的檔案處理:哪些儲存格填寫、哪些留空、以及原因。

Pack gate:在貨物規格回填中的含義